Welcome to CS1-GLAMOUR Project

You are here:   Home > Research structure

Research structure

The research activity inside GLAMOUR project is organized in six Workpackages, i.e.:

  1. WP1 Optimisation of Load Alleviation System Control Laws
  2. WP2 WT Model and control system design & manufacturing
  3. WP3 Wind Tunnel gust generator design and manufacturing
  4. WP4 Static Checks and Ground Vibration Tests
  5. WP5 Wind Tunnel Tests
  6. WP6 Assessment of Project Results

A further Workpackage (WP7) is dedicated to the Project Management activity.

« prev  |   top  |   next »

Powered by CMSimple | Template: ge-webdesign.de | Login